Proven programme, faithfully implemented
Push / Pull / Legs
- Length
- Ongoing
- Days a week
- 6
- Kit
- Barbell, Dumbbells, Gym machines
Push / Pull / Legs groups training by movement pattern rather than by day of the week — pushing muscles, pulling muscles, legs — and the r/Fitness version keeps a 5×5 barbell lift with an AMRAP top set at the head of each day. So it has a bodybuilding split's shape with a linear-progression strength engine inside it, and it scales from three days a week to six by simply running the cycle again.
Who it's for
- Best for: Size, without giving up compound strength work — and a split that bends to however many days you can actually train.
- Experience: Intermediate. The lifts are standard; what it asks for is the consistency to keep a rotation going rather than a fixed weekly timetable.
- Time: Three to six days a week — one full cycle is three sessions, and you run as many cycles a week as you can recover from.
How it's built
Open a day to see every exercise. Iron Forge keeps a working weight for each exercise and fills it in for you.
Push #1 (Bench)
Barbell Bench Press + 5 more
- Barbell Bench Press — 4×5, 1×5+
- Incline Dumbbell Bench Press — 3×8–12
- Triceps Pushdown — 3×8–12
- Lateral Raise — 3×15–20
- Overhead Triceps Extension — 3×8–12
- Lateral Raise — 3×15–20
Pull #1 (Deadlift)
Deadlift + 5 more
- Deadlift — 1×5+
- Lat Pulldown — 3×8–12
- Seated Cable Row — 3×8–12
- Face Pull — 5×15–20
- Dumbbell Hammer Curl — 4×8–12
- Dumbbell Curl — 4×8–12
Legs #1
Barbell Squat + 4 more
- Barbell Squat — 2×5, 1×5+
- Romanian Deadlift — 3×8–12
- Leg Press — 3×8–12
- Leg Curl — 3×8–12
- Standing Calf Raise — 5×8–12
Push #2 (Overhead Press)
Overhead Press + 5 more
- Overhead Press — 4×5, 1×5+
- Incline Dumbbell Bench Press — 3×8–12
- Triceps Pushdown — 3×8–12
- Lateral Raise — 3×15–20
- Overhead Triceps Extension — 3×8–12
- Lateral Raise — 3×15–20
Pull #2 (Row)
Barbell Row + 5 more
- Barbell Row — 4×5, 1×5+
- Lat Pulldown — 3×8–12
- Seated Cable Row — 3×8–12
- Face Pull — 5×15–20
- Dumbbell Hammer Curl — 4×8–12
- Dumbbell Curl — 4×8–12
Legs #2
Barbell Squat + 4 more
- Barbell Squat — 2×5, 1×5+
- Romanian Deadlift — 3×8–12
- Leg Press — 3×8–12
- Leg Curl — 3×8–12
- Standing Calf Raise — 5×8–12
How Iron Forge runs it
How it works
Push/Pull/Legs (PPL) groups training by movement pattern: Push days (chest, shoulders, triceps), Pull days (back, rear delts, biceps), and Leg days (quads, hamstrings, glutes, calves). This is the r/Fitness (Metallicadpa) version — a fixed six-day week where each pattern is trained twice. The two Push and two Pull days alternate the heavy lift: one Push day leads Bench, the other Overhead Press; one Pull day leads Deadlift, the other Barbell Row; Squat leads both Leg days. Each session pairs that heavy barbell main with higher-rep accessory work.
Main lifts: 5×5 with an AMRAP top set
The lead barbell lift each day runs 5×5, and the last of those sets is an AMRAP (as many reps as possible) — so Bench, Overhead Press and Row go 4×5 then a 5+ set. Squat runs 2×5 then a 5+, and Deadlift is a single 5+ set. The AMRAP both earns your next weight jump and warns you when the load is getting heavy. It is not a 5–8 rep double-progression range — the mains are straight 5×5.
Progression
The barbell mains progress by AMRAP-gated linear progression: clear all the prescribed reps and the weight goes up a fixed increment next session; stall three sessions in a row and it deloads 10% and rebuilds. The accessory work (arms, delts, calves, leg curls) uses double progression instead — add reps across its range (8–12, or 15–20 on smaller muscles), then add weight once you reach the top.
Questions
How many days a week does this run?
It's a fixed six-day week — Push/Pull/Legs run twice through, so every muscle is trained twice. That twice-a-week frequency is the whole point of this version; there isn't a 3-day setting.
Why do the two Push and Pull days lead different lifts?
The heavy main alternates: Bench on one Push day, Overhead Press on the other; Deadlift on one Pull day, Barbell Row on the other (Squat leads both Leg days). It spreads heavy pressing and pulling across the week while still hitting each pattern twice.
What rep ranges should I use?
The barbell mains are 5×5 with an AMRAP last set — straight fives, not a 5–8 range. Accessories run roughly 8–12 (or 15–20 on smaller muscles) for volume and pump.
How do I progress?
Mains: linear — clear your 5×5 and add a fixed increment next session; three stalls in a row triggers a 10% deload and you build back up. Accessories: double progression — add reps across the range, then add weight at the top.
Is PPL for strength or size?
Primarily size (hypertrophy), but the 5×5 barbell work keeps you getting stronger too. It's one of the most popular muscle-building splits.
Can beginners run PPL?
They can, but a true novice usually gains faster on a full-body linear programme first. This split shines for early-intermediates who benefit from more volume per muscle.
How much rest between sets?
About 2–3 minutes on the heavy 5×5 barbell work, and 60–90 seconds on accessory work. Rest long enough to keep your reps up on the mains.
Push / Pull / Legs in Iron Forge


Ready to run Push / Pull / Legs?
Log your lifts. Iron Forge handles the maths.